Sign In | Join Free | My hardware-wholesale.com
China Jinzhou City Shitan Machinery Equipment CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump
Verified Supplier

7 Years

Home > Engineering Drilling Rig >

100m Engineering Drilling Rig Geological Exploration Hydraulic

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

100m Engineering Drilling Rig Geological Exploration Hydraulic

  • 1
  • 2

Brand Name : ShiTan

Model Number : XY-1

Certification : ISO9001

Place of Origin : China

MOQ : Negotiation

Price : Negotiation

Payment Terms : L/C, D/A, T/T, Western Union

Supply Ability : 2000set/year

Delivery Time : Within 7-12 days

Packaging Details : Standard Export package

Type : Farming Borewell 100m Water Well Drilling Rig Machinery

Power Type : Diesel

Usage : water well,railways, core drilling

Drilling depth : 100m

Dimension(L*W*H) : 1640*1030*1440mm

Drill pipe diameter : 42mm

Borehole dip angle : 90°~75

Spindle speed : 142、285、570(r/min)

Model : YBC-12/125

Rated pressure : 12.5Mpa

Model(diesel engine) : 1105

Rated power : 18KW

Contact Now

100m Geological Exploration Hydraulic Engineering Drilling Rig

XY-1 Water Well Drilling Rig Information

XY-1 Small hydraulic core drilling rig is a kind of small-scale sampling and drilling equipment widely used in plains, mountainous areas and areas with inconvenient transportation and energy. It has the advantages of compact structure, small occupied area, light weight and convenient movement. It is suitable for geological sampling exploration, geological core drilling, small grouting holes, blasting holes, grouting holes, etc. in railway, water conservancy, water wells, construction projects and outdoor mountain areas. Diamond, composite and alloy bits can be selected for drilling according to different formations.

XY-1 Water Well Drilling Rig Technical Data

Drill Swivel Head

Drilling depth

Max.130m

Spindle speed

1010,790,470,295,140(r/min)

Hole diameter

Max.130mm Spindle stroke 450kmm
Drill rod diameter 42mm Spindle pull-down Max.15KN
Angle range 90-75 Spindle lifting capacity Max. 25KN
Oil pump Water pump
Model YBC-12/125 Model Horizontal reciprocating single-acting piston pump
Rated pressure 12.5Mpa Working pressure Max. 1.25Mpa
Flow speed 8ml/r
Rated speed 1500r/min
Hoist Power(diesel)
Max. lifting capacity 15KN Model(diesel engine ZS1105
Hoisting drum revolution

121,76,36(r/min)

Rated power 12.1KW
Drum diameter 140mm Rated speed 2200r/m
WEIGHT AROUND 600KG
SIZE 1620*970*1560mm


XY-1 Water Well Drilling Rig Main uses:

◇ engineering investigation ◇ geophysical and geochemical exploration drilling sampling ◇ advanced drilling

◇ drilling and grouting ◇ pilot holes of embedded parts ◇ various blasting drilling ◇ inspection holes

◇ small household water wells ◇ regional geological survey ◇ mine vein exploration

◇ ore grade evaluation ◇ geotechnical engineering detection

XY-1 Water Well Drilling Rig Features

XY-1 drill rig is used to survey and exploration, geophysical prospecting, road and construction exploration, punching blastinghole, etc.

Used for general investigation, geophysical exploration, high-way and building construction, and blast-hole drilling etc.
1. With hydro-automatic feeding device, and high drilling efficiency.
2. Designed with hydro-chucking unit instead of slips to ensure drilling from stop when changing pipes.
3. Close levers, convenient to operate, safe and reliable operations.
4. Compact in structure. All the drill, water pump and diesel engine installed on one base frame result in space-saving.
Light in weight, easy disassembling for transportation and applicable to working conditions in plain and mountain areas

What is the construction technology of de watering well?

Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.

The de watering shall be carried out 20 days before the excavation of the foundation pit, so as to drain the stagnant water in the stratum in advance, reduce the groundwater level, improve the self stabilization capacity of the soil layer, and smoothly carry out the anhydrous operation. During the de watering operation, the water level observation of each well shall be done well, and the change of the head of the confined aquifer shall be mastered in time

100m Engineering Drilling Rig Geological Exploration Hydraulic

100m Engineering Drilling Rig Geological Exploration Hydraulic
100m Engineering Drilling Rig Geological Exploration Hydraulic
100m Engineering Drilling Rig Geological Exploration Hydraulic


Product Tags:

100m engineering drilling rig

      

geological hydraulic engineering drilling rig

      

100m exploration drilling rig

      
China 100m Engineering Drilling Rig Geological Exploration Hydraulic wholesale

100m Engineering Drilling Rig Geological Exploration Hydraulic Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)